So, first update of 2022 and where to begin... So starting at Be through JR a decent amount of custom trees have been placed, not spent a lot of time on that side of the island. PH, did some work in the camp and built up the terrain along the Cathy's beach path, now a better representation of the game area. for the hose I've managed to work in a staircase under the stairs, for the basement mentioned in the walkthrough.
Attachment:
ll.png [ 1.88 MiB | Viewed 320 times ]
Going next door to the Lowlands three unique tree designs have been added. The EA complex has seen various bits of progress, most notably a JW lagoon style fence has been added to the complex side of the lagoon. A JWFK style gate seals of the paddock from the ocean.
Attachment:
it.png [ 1.82 MiB | Viewed 320 times ]
In the IT the only change was the swapping of stone bricks to smooth sandstone for the ops building. The aviary dome and canyon fencing are in place with a gate for the barge to enter and leave. aside from the entrance seen in the movie a second building has been added to the peninsula outcropping, this one edited to look like the one from the concept art image. This same building has been added to the dam reservoir area, going to be the entrance to a second aquarium.
Attachment:
wv.png [ 1.98 MiB | Viewed 320 times ]
Now we reach the big changes, first off, the worker village building that were in the demo area have been removed and moved to a new home next to As2, the area is now a recreation of the film set but with a few added buildings.
Attachment:
pv.png [ 1.87 MiB | Viewed 320 times ]
In its place a third helipad with stairs, phone, shack, and to fill the large void where the boarding house is the radio bunker from JWFK. Its purpose is going to a storage building and maybe a shortcut tunnel or something. Along with these changes the area has returned to being populated with trees. And finally, the last area of major change is the harbor.... which has been lowered by six blocks. Despite the mess it caused to the surrounding terrain the change has been something I long wanted, the height difference from the water was just outrageous - even for it being low tide. thankfully most of the mess is cleaned up and work on the rail yard is starting.